Skip to main content

Quebec

First 735 kV AC Transmission System
Society: IEEE Main Category: Electric Sub Category: Era: 1960-1969 DateCreated: 1965 Hydro-Quebec Montréal State: Quebec Zip: Country: Canada Website: http://www.ieeeghn.org/wiki/index.php/Milestones:First_735_kV_AC_Transmission_System,_1965 Creator: Hydro-Quebec

Hydro-Quebec's 735,000 volt electric power transmission system was the first in the world to be designed, built and operated at an alternating-current voltage above 700 kV. This development extended the limits of long-distance transmission of electrical energy. On 29 November 1965 the first 735 kV line was inaugurated. Power was transmitted from the Manicouagan-Outardes hydro-electric generating complex to Montreal, a distance of 600 km.

YearAdded:
2005
Image Credit: Courtesy Wikicommons/abdallahh (cc-by-2.0) Image Caption: A pylon of the 735kV power transmission system. Era_date_from: 1965
Quebec Bridge
Society: ASCE Main Category: Civil Sub Category: Bridges Era: 1910-1919 DateCreated: 1917 Quebec Bridge Quebec City State: Quebec Zip: G1K 4J9 Country: Canada Website: http://www.asce.org/Project/Quebec-Bridge/ Creator: McLure, Norman , Cooper, Theodore

The bridge is immense, not only in length and weight but in width. At 67 feet wide, it can accommodate two sets of railway tracks, two sets of streetcar tracks and two roadways.

It took three tries and cost 89 lives, but the city of Quebec was determined to compete with provincial rival Montreal for commercial rail traffic in the late 19th century. The solution was a rail bridge across the St. Lawrence River requiring a single cantilever span 1,800 feet long - the longest ever attempted. 

YearAdded:
1987
Image Credit: Courtesy Wikipedia/Sebastien Savard (CC BY-SA 2.5) Image Caption: Quebec Bridge Era_date_from: 1917
Subscribe to Quebec

Innovations

Quebec Bridge

The bridge is immense, not only in length and weight but in width. At 67 feet wide, it can accommodate two sets of railway tracks, two sets of streetcar tracks and two roadways.

It took three tries and cost 89 lives, but the city of Quebec was determined to compete with provincial rival…

Read More
First 735 kV AC Transmission System

Hydro-Quebec's 735,000 volt electric power transmission system was the first in the world to be designed, built and operated at an alternating-current voltage above 700 kV. This development extended the limits of long-distance transmission of electrical energy. On 29 November 1965 the first 735…

Read More

We hope you enjoyed this essay.

Please support America's only magazine of the history of engineering and innovation, and the volunteers that sustain it with a donation to Invention & Technology.

Donate

Stay informed - subscribe to our newsletter.
The subscriber's email address.